Other information:
Specifications
Specification
Item
Specification
Coil Resistance (Ω) 18.5 - 22.5 [23°C(73.4°F)] Pin 2
Description and operation
Description
Installed
on the surge tank, the Purge Control Solenoid Val ...
Filter replacement
It must be replaced when necessary,
and should not be washed.
You can clean the filter when inspecting
the air cleaner element.
Clean the filter by using compressed
air.
1. Loosen the air cleaner cover attaching
clips and remove the air
cleaner hose.
2. Wipe t ...